A bond’s covenants decide what the company may do for as long as the bond is outstanding. In negotiation, most of the attention goes to one number: the leverage limit. Two other questions usually matter more. When is that limit tested? And what happens on the day it is crossed?
Two ways to test the same ratio
Take a covenant that says net debt must not exceed 3.5 times EBITDA. It can be written in two very different ways.
A maintenance covenant is tested on a schedule, typically at every reporting date. Federal Reserve Bank of Boston economists describe these as covenants that “require the borrowers to continuously comply with the covenant thresholds” (Bräuning, Ivashina and Ozdagli, 2022 (opens in a new tab)). If the ratio is above the limit on a test date, the covenant is breached, whatever the company did or did not do.
An incurrence covenant is tested only when the company wants to take a particular step: borrow more, pay a dividend, grant security, make an acquisition. The same paper describes incurrence covenants as ones that “restrict some actions of the borrowers if the covenant thresholds are crossed but do not lead to violations of the contracts and associated shifts in control rights.”
Bank loans traditionally carry maintenance covenants. International high-yield bonds are typically written on incurrence tests, because a bond held by many investors is hard to renegotiate every time a quarter comes in weak.
The difference for the issuer is simple to state:
- under a maintenance test, a weak year can put the company in breach without it doing anything;
- under an incurrence test, the company can only trip the covenant by acting, and the consequence is that the action is blocked.
Incurrence tests are not toothless. The same research found that when incurrence restrictions are triggered, companies’ debt-to-assets ratio falls by about 2.7 percentage points. That is more than the 1.6 points the authors measured after a maintenance covenant violation. The covenant works by shaping what the company does next, rather than by handing control to creditors.
What a typical covenant package contains
The names vary by market and by deal, but most bond covenant packages are built from the same parts.
| Covenant | What it restricts | What the issuer should look at |
|---|---|---|
| Limitation on indebtedness | New debt, unless a ratio test is met or the debt fits a permitted basket | The size of each basket, especially the general basket and the basket for bank facilities |
| Restricted payments | Dividends, share buybacks and investments outside the group | How much capacity builds up from retained profits, and what counts as an investment |
| Limitation on liens (negative pledge) | Granting security over assets to other creditors | Which existing and future security is carved out |
| Asset sales | Selling assets without reinvesting or repaying debt | How long the company has to reinvest the proceeds |
| Change of control | A sale of the company | What counts as a change of control, and the repurchase price offered to holders (in high-yield bonds, commonly 101% of principal) |
| Events of default | Non-payment, covenant breach, cross-default, insolvency | Cure periods, and the size of debt default that triggers cross-default |
Two features of this structure are easy to miss.
First, a company that fails the ratio test can usually still borrow under the permitted baskets. In an incurrence package, the baskets are often worth more attention than the ratio itself.
Second, the covenants interact. A dividend may need room under the restricted payments covenant and, if it is debt-funded, under the debt covenant as well.
The definition is the covenant
A leverage covenant is only as strict as the definitions behind it. “EBITDA” in a bond is whatever the document says it is, and documents routinely adjust it. Common adjustments add back restructuring costs, expected cost savings and the earnings of businesses acquired during the period.
Economists at the Federal Reserve Bank of St. Louis studied these definitions in syndicated loans. They found that “financial covenants in syndicated loan agreements often rely on definitions of EBITDA that deviate from the GAAP definition”. They also found that such add-backs “increase the likelihood of loan delinquency and default, and also increase the likelihood of the borrower experiencing a ratings downgrade” (Faria-e-Castro, Gopalan, Pal, Sánchez and Yerramilli, 2022 (opens in a new tab)).
The study covers loans, but bond documents face the same drafting choice. For an issuer, a generous definition buys headroom. Investors know this and price it. The discipline that matters is internal: forecast covenant EBITDA under the document’s own definition, and keep it separate from the EBITDA the board sees in management accounts.
Net debt deserves the same scrutiny. Whether cash can be netted, and up to what amount, whether leases count, and how shareholder loans are treated can each move the ratio by a full turn.
How much room does the company have?
The calculator below runs one leverage test. Switch between the two test types: the arithmetic stays the same, and the consequences change.
EBITDA can fall 20% before the test fails.
Under a maintenance test, failing it is itself a breach, usually an event of default once any cure period runs out. The company does not have to do anything to fail; a weak year is enough.
- Leverage today
- 2.8x
- Headroom
- 0.7x
In the opening example, leverage is 2.8x against a limit of 3.5x, so EBITDA can fall 20% before the line is reached. Under a maintenance test, a 21% fall is a breach. Under an incurrence test, the same fall closes the door to new ratio debt and to payments that depend on the test, and the company carries on.
Five things to model before signing
- Run the covenants on your own forecast, including a downside case. Use the document’s definitions, not the accounts’. The question is not whether the company complies today, but how bad a year it can absorb.
- Map every planned action to its permission. For the life of the bond, list the acquisitions, debt-funded capital expenditure, dividends and refinancings the business expects. Each needs room under a ratio or a basket. Negotiate for the plan, not for the present.
- Read the bond together with your other debt. Bank facilities often carry maintenance tests that are tighter than the bond’s. Cross-default clauses link them, so the tightest covenant anywhere in the structure is the one that binds.
- Know what it takes to change the terms. A bilateral loan is renegotiated with one bank. A bond is amended through holder consent at the thresholds the document sets, which takes longer and usually costs a fee.
- Build the reporting into the finance calendar. Covenant compliance is demonstrated through reporting. The deadlines in the document have to fit the audit timetable, every year, without exception.
A covenant package is a description of the company’s next five years, written before they happen. It is worth drafting as carefully as the business plan it constrains.
Consultive advises issuers, investors and transaction participants on capital markets matters, including transaction structuring, offering documentation and execution. This article is general information, not legal or financial advice. It relies on the public research linked in the text, checked on 25 November 2026.